Hours 9:00 am- 1:00 pm - Tu, Th & Sat
Cart: 0 items 0

Captain Phil and Ferry Schedule

11 April 2025 – Captain Phil has decided to move on and the Trust wishes him well. Consequently, the Ferry will be closed on Saturday, 12 April 2025. The Trust is actively seeking a replacement. The Ferry will resume normal operation on Sunday, 13 April. Please watch the website for updates that may impact the Ferry schedule.

Repair Update and Volunteers Build new benches!

10 April 2025 – The Beach Ferry will have a delayed opening on Friday, 11 April 2025. The Ferry lift and lift hardware will be repaired. Motors for the lift will be replaced, along with pulleys, and more. The Ferry will open at 1:00 pm on Friday, then return to normal season schedule (9:30 am to sunset daily). A Trust…

Beach Livesteam (BeachCam) Restored

2 April 2025 – The Trust is happy to let everyone know that the beach video livestream is up and running again. Special thanks to Gary Cole, the newest Trustee, for restoring the BeachCam! Gary has worked many hours on getting a very low-cost solution up and running. The BeachCam can be seen on the home page of the South…

Ferry Repair Update

1 April 2025 – The Ferry batteries were replaced today! Our local certified and mobile marine mechanic, who is authorized to make warranty repairs on the Ferry electric motor, needs to inspect and diagnose the motor. He will either fix or replace it. If the motor cannot be repaired, the Trust will have the brand new backup motor, that we…

Thank you!!

28 March 2025 – The South Venice Beach Endowment Trust owes a great big thank you to whoever found, restored, and reinstalled the sign for the property at 4800 Lemon Bay. This sign was missing ever since Hurricane Milton. Despite major efforts to locate it, we were left thinking it would have to be remade. We on the board and…